Splendor Forum

Splendor Forum, the flagship building of Splendor Group, houses many official registered offices of several companies, including the head corporate office of Splendor Group. A unique blend of urban sophistication with refined indulgence, Splendor Forum was designed by world-renowned architects. With a modern elevation, robust infrastructure and hassle-free maintenance facilities, Splendor Forum is a landmark building following whose footsteps the Jasola District Centre was built over the years. The complex is built on 1.4 Acres with 2,60,000 sq. ft. of built-up area.

  • New Delhi

  • 1.4 Acres

Amenities

  • Strategically located in the heart of south Delhi
  • Double Glazed glass shell
  • Easy access to Noida, Faridabad, and Gurgaon via Faridabad expressway

Technical Features

External Façade
  • External façade of state of the art Structural Glazing and Granite stone cladding
  • Structural Glazing consists of sandwiched double layered High Performance low-e value hermetically sealed Titanium Blue Reflective Toughened Glass (Saint Gobain) with air for effective insulation, reflecting heat energy and reducing UV rays
  • Granite Stone dry cladding used fixed with SS clamps with air gap, providing insulation to the building
HVAC
  • Fully air-conditioned office / retail space spanning ground level plus five floors
  • State of the art imported energy saving Dunham Bush helical rotary screw type 2-compressor, water cooled chillers with Micro-processor based control system
  • The chillers installed use environment friendly R134a (HFC) refrigerant, as per Kyoto Protocol, which does not affect the Ozone depletion
  • Treated Fresh Air supply system installed for Ground and 1st floors saving on energy consumption by the chillers
  • Ozone flooding system installed on 2nd to 5th floor to mix with fresh air to clean and disinfect the indoor environment, resulting in reduction of fresh air induction, thereby saving on energy consumption
  • All three basements provided with fresh air ventilation with automatic shut-off and smoke extractors in case of fire
  • HVAC system in the building integrated with Building Management System installed for time and temperature management saving substantially on energy consumption

Power Back-up System

  • 100 percent power back-up with inbuilt redundancy and no load restrictions
  • Nos. three Volvo MTU / Kirloskar DG sets with high efficiency and low oil consumption
Energy Saving Lighting
  • Extensive use of LED lights with electronic ballasts in all public areas indoors
  • Metal Halide lights for outdoor lighting system
Communications/ Internet
  • Tele- communication wiring on all floors can be provided at extra cost
  • Internal signal boosters for clear mobile phone connectivity
  • Digital music in all common areas
  • Public Address system in all common areas
Fire Detection/ Fighting Systems
  • A state of the art fire detection and alarm system linked to centralized Building management system
  • Automatic water sprinklers in all basements and floors
  • Fire hydrants/ Fire extinguishers in all basements and floors
Elevators
  • 4 Nos. High-speed passenger/service elevators connecting three basements and all the floors
Building Management System
  • An intelligent Building Management System integrated with HVAC, DGs, HT/LT system, PLC, elevators, Fire Detection/ Fighting, WTP, STP, etc. for automatic energy management
Rain Water Harvesting
  • Rain water harvesting system for water conservation